CARPENTERConstruction · Fort Worth
A hand plane on a white-oak board in warm side light: a long shaving curls off the blade, a brass-edged steel square and a pencil line lie beside it

Remodeling · Roofing · Storm repairRemodeling · DFW

DFW remodeling. Built right the first time.

Kitchens, baths, additions, decks and roofs: designed, priced in writing and built by one accountable team. Family-owned, working across Dallas–Fort Worth.

Leak or storm damage? Call (469) 962-4286 or mark your request urgent: the on-call crew sees it first.

  • Insured, certificate before work
  • 3-year written warranty
  • No more than 25% down
  • Free estimate within 48 hours

Sample DFW figures. After the free walkthrough you get a written, line-by-line bid.

What we build

One crew. Start to finish.

Design-build means one contract and one accountable team. The ranges below are sample DFW numbers; every real quote starts with a free walkthrough and ends as a written line-item bid.

Sample pricing

Kitchen remodeling

Cosmetic refresh to full gut. Refresh: refaced cabinets, new counters, hardware, paint. Mid-range: semi-custom cabinets and quartz. High-end: custom cabinetry and layout changes.

$12K–$25K refresh · $30K–$60K mid · $60K–$125K+ fullTimeline: 2–4 wks refresh · 6–10 wks mid · 12–20 wks full gut
Ask about a kitchen

Bathroom remodeling

Tub-to-shower conversions in days, not weeks. Full primary baths with custom tile walk-in showers, double vanities and real waterproofing behind the tile.

$6K–$15K conversion · $15K–$30K hall bath · $30K–$55K primaryTimeline: conversion 2–5 days · full bath 3–5 weeks
Ask about a bath

Room additions

Bump-outs, bedrooms, second stories, garage conversions. We handle drawings, engineering and city permits; Dallas, Fort Worth, Plano and Frisco each permit differently.

$150–$300/sq ft ground floor · $200–$400/sq ft second storyTimeline: 3–6 months including permits
Ask about an addition

Decks and outdoor living

Pressure-treated, cedar or composite with hidden fasteners and engineered footings. Covered patios, pergolas and outdoor kitchens built for 105° summers.

$18–$28/sq ft treated · $40–$60/sq ft composite · $70–$155/sq ft coveredTimeline: 1–2 weeks · covered 2–5 weeks
Ask about a deck

Roofing and storm damage

Tear-offs and re-roofs in architectural or Class 4 impact-resistant shingle. Free hail inspection with a written photo report, and we meet your adjuster on the roof.

$9K–$16K typical 2,000 sq ft home · $4.50–$6.50/sq ft architecturalClass 4 upgrade +$1K–$2K; ask your insurer about a wind and hail discount
Ask about a roof
Urgent

Handyman and emergency repair

Same-week small jobs: drywall, doors, rot repair, fence sections, siding. Emergencies like a roof tarp or burst pipe get priority dispatch; the permanent fix is quoted the next business day.

$150 service call · $300–$450 half-day · $500–$1,500 emergency responseMark it urgent in the estimate form and the on-call crew gets it first
Get urgent help

Cost guide

What remodeling costs in DFW.

We publish the numbers. These are sample metroplex ranges; your written bid names every material and shows the contingency as its own line.

Sample figures

Kitchens & baths

ProjectRangeTimelineWhat that buys
Kitchen, refresh$12K–$25K2–4 weeksCabinet refacing, new counters, hardware, paint
Kitchen, mid-range$30K–$60K6–10 weeksSemi-custom cabinets, quartz, backsplash, appliances
Kitchen, high-end or layout change$60K–$125K+12–20 weeksCustom cabinetry, walls moved, full re-layout
Bath, tub-to-shower conversion$6K–$15K2–5 daysFull conversion with real waterproofing behind the tile
Bath, hall bath$15K–$30K3–5 weeksFull remodel, tile, vanity, fixtures
Bath, primary with walk-in shower$30K–$55K3–5 weeksCustom tile walk-in, double vanity, layout tweaks

Roofs, decks & additions

ProjectRangeTimelineWhat that buys
Roof, typical 2,000 sq ft home$9K–$16K1–3 daysTear-off plus architectural shingles at $4.50–$6.50/sq ft
Roof, Class 4 impact-resistant+$1K–$2KSameAsk your insurer about a wind and hail discount
Deck, pressure-treated$18–$28/sq ft1–2 weeksEngineered footings, railings that stay solid
Deck, composite$40–$60/sq ft1–2 weeksComposite boards, hidden fasteners, no staining
Deck, covered or roof tie-in$70–$155/sq ft2–5 weeksEngineering and permit for the tie-in included
Addition, ground floor$150–$300/sq ft3–6 monthsDrawings, engineering, permits, full build
Addition, second story$200–$400/sq ft4–6 monthsStructural work priced up front, not discovered later

Handyman & emergency

JobRangeWhat that buys
Service call$150Same-week small jobs: drywall, doors, rot repair, fence sections, siding
Half-day$300–$450Half a day on site for a short list of small jobs
Emergency response$500–$1,500Roof tarp, burst pipe, tree on the roof: the on-call crew goes out, and the fee is quoted before anyone rolls

Where the money goes on a kitchen

Each bar is the typical range for that line as a share of the budget, not a split that adds to 100%.

Cabinets25–35%
Labor20–35%
Appliances15–20%
Counters10–15%
Flooring5–10%
Contingency, on its own line10–15%

We show a 10–15% contingency as its own line. If it isn't used, you keep it.

Our process

What happens after you reach out

No mystery and no four-hour sales pitch. Six steps, each one ending in something written down.

  1. 1

    Free estimate

    Tell us about the job and we book a 15-minute call, then an in-home visit within 48 hours, 45 to 60 minutes. You get a written ballpark range on the spot.

    Written: a ballpark range
  2. 2

    Design and fixed bid

    For kitchens, baths and additions, a design agreement (usually 4–8% of the project, credited to the build) buys drawings, selections and a fixed written price, line by line.

    Written: a fixed line-item bid
  3. 3

    Contract and schedule

    A plain-English contract: scope, named materials, start date, finish window, draw schedule, warranty. No more than 25% down; payments follow finished milestones.

    Written: the contract
  4. 4

    Permits and prep

    We pull the city permits and protect your home: floor protection, dust walls, daily cleanup. You meet the crew before anyone swings a hammer.

    Written: the city permits
  5. 5

    Build

    A named project manager, photo updates twice a week and one point of contact. Electrical, plumbing and HVAC by state-licensed trades, license numbers on every invoice.

    Written: photo updates twice a week
  6. 6

    Walkthrough and warranty

    The punch list is signed before the final payment. Then your warranty packet: a written 3-year workmanship warranty plus manufacturer warranties in your name.

    Written: signed list and warranty

How long each job takes

The scale runs from 0 to 6 months. Each bar spans the low to high build time from the cost guide.

Roof, typical home1–3 days
Bath, tub-to-shower2–5 days
Deck, treated or composite1–2 weeks
Kitchen, refresh2–4 weeks
Hall or primary bath3–5 weeks
Deck, covered2–5 weeks
Kitchen, mid-range6–10 weeks
Kitchen, full gut12–20 weeks
Addition, ground floor3–6 months with permits
Addition, second story4–6 months

Permits are the wild card on additions: on a recent job McKinney's permits ran six weeks, and the owners heard that on day one.

Recent work

Projects, with the numbers attached

City, budget band and duration on every job. Drag the handle, or use the arrow keys, to see the before and after.

Illustrations of sample projects, not client records

Engineered beam9-foot quartz island Load-bearing wallClosed-in kitchen BeforeAfter Illustration
Wall down, island inKitchenPlano

Took down the load-bearing wall to the dining room with an engineered, permitted beam; semi-custom shaker cabinets and a 9-foot quartz island. Old aluminum wiring found at the range circuit was photographed, priced in a written change order and replaced before drywall.

Budget$45–55KDuration7 weeks
Curbless Heated floor Step-over tubSingle vanity BeforeAfter Illustration
Primary bath, curbless walk-inBathFrisco

Full gut: curbless tile shower on a waterproof pan, double floating vanity, heated floor. The waterproofing was flood-tested for 24 hours before a single tile went on.

Budget$38–44KDuration4 weeks

Drag the handle to compare. These are illustrations; a live site shows photos of your own jobs.

LIVINGKITCHENDININGBEDROOM BEDROOMBATHCLOSET 420 sq ft N ExistingNew: primary suite Illustration
AdditionMcKinney

Primary suite bump-out

A 420 sq ft ground-floor addition, bedroom, bath and closet, with matched brick and roofline. McKinney permits ran six weeks, and the owners heard that on day one.

Budget$95–110KDuration19 weeks
Engineered tie-in + flashing360 sq ft Illustration
DeckSouthlake

Covered composite outdoor room

A 360 sq ft composite deck with a shingled roof tie-in, ceiling fans and a gas line for the grill. The roof tie-in was engineered and permitted, the step that keeps flashing from leaking.

Budget$52–60KDuration5 weeks
North slope: hits chalkedClass 4 Illustration
RoofArlington

Hail claim, Class 4 upgrade

Spring hail took the north slopes. Documented inspection, met the adjuster on the roof, supplement approved for decking found at tear-off. The owner paid the Class 4 difference and the deductible, as the law requires.

Budget$14–16KDuration2 days
11:00 PM: limb through the roof1:30 AM: tarped and boarded Illustration
EmergencyGrand Prairie

Limb through the garage roof, 11 PM

A storm dropped a limb through the garage roof at night. The on-call crew tarped and boarded it by 1:30 AM; the permanent repair was quoted the next business day and finished that week.

Responseabout 2.5 hoursRepairsame week

Why homeowners choose us

Texas doesn't license remodelers. So judge us by what's verifiable.

Anyone with a truck can call himself a contractor in Texas, which is why we over-prove it. Every line below is the kind you can check.

Example trust block

  • Certificate of insurance before any work.$1M general liability plus workers' comp; the certificate arrives before the first swing, and you can verify it with the carrier.
  • State-licensed trades on every job.Electricians and HVAC via TDLR, plumbers via TSBPE, license numbers on every invoice.
  • No more than 25% down.Payments follow finished, inspected milestones. Final payment only after your signed walkthrough.
  • Homestead protection, shown without asking.On homestead projects over $5,000, Texas law requires your payments to sit in a dedicated construction account; we show you the verification.
  • A written 3-year workmanship warranty.Plus manufacturer warranties registered in your name, not ours.
  • Fixed line-item bids with a visible contingency.10–15%, shown as its own line. If it isn't used, you keep it.
  • A named project manager.Crew intro on day one and photo updates twice a week.
  • Our own crew in your house.Our demo, carpentry and tile crews are our own employees. Plumbing, electrical and HVAC go to the same licensed partner companies every time, and their license numbers appear on your invoice.
Certificate of insuranceSample document
Insured
Carpenter Construction
General liability
$1,000,000
Workers' compensation
Included
Delivered
Before day one
How to verify
With the carrier

On a live site this is your real certificate.

3years, in writing

A workmanship warranty, signed and handed over in your warranty packet at the end of the job.

  • Manufacturer warranties registered in your name
  • The punch list is signed before the final payment
  • If something is wrong on your job, you call and it gets fixed

A note from Andrew

Example note
“I started this company after watching a neighbor get burned by a storm-chaser: a big deposit, three days of work, then a disconnected phone. That is why we run the way we do: paperwork first, small deposits and my name on every contract.”
“I walk every job myself. If something is wrong on your job, you call me and I fix it.”

— Andrew Carpenter, Owner

The crew on your job

Example names
  • AndrewOwner · signs every contract
  • LuisProject manager · photo updates twice a week
  • TashaTile and finish lead

Sample names. On a live site, this is the real crew.

Financing

Good work shouldn't wait on a lump sum

The real options, including the one that doesn't go through us.

Sample terms: illustrative rates

1

12-month same-as-cash

True 0% if paid in full, no retroactive interest. Through a third-party lender: quick approval, soft credit pull, no home equity needed.

2

Fixed terms up to 144 months

7.99–17.99% APR depending on credit, fixed payment, no prepayment penalty.

3

Bring your own HELOC

Often the cheapest money for a $50K+ job, and we'll say so out loud. We're happy to be paid from your bank.

The honest part: a 0% promo costs us a dealer fee, so cash bids can come in lower. Ask for both numbers, the cash price and the financed price.

How the payments work

  1. Up frontNo more than 25%. On small jobs, often nothing until materials are ordered.
  2. By milestoneEach payment follows a finished, inspected milestone.
  3. Final walkthroughYou walk the job with us and sign the punch list.
  4. Final paymentOnly after your signed walkthrough.

Financing is provided by third-party lenders, subject to credit approval.

Storm damage and insurance claims

Hail hit? Here's exactly how the claim works.

DFW is hail country, and hail country is where the scams live. Here is the whole process in writing, including the part about your deductible.

1

Free documented inspection within 48 hours

Photos, close-ups and a written report you keep either way. No pressure, no sign-now clipboard.

2

You file the claim, not us

We never push you to file. If the damage doesn't clear your deductible, we tell you that too.

3

We meet your adjuster on the roof

So the scope is complete: decking, flashing, vents, the things missed from the driveway.

4

Paying your deductible is the law

Most Texas policies carry a 1–2% wind and hail deductible. It is illegal in Texas for a contractor to waive or absorb it, so we never offer a free roof.

5

RCV and ACV, in one line

Replacement cost pays what a new roof costs; actual cash value pays the depreciated value. Check which one your policy says before the storm.

6

File inside your policy window

Many Texas insurers expect wind and hail claims within a year of the storm. The inspection report is yours either way.

Tarping and water mitigation

We stop the damage first. Paperwork second.

Roof tarp, board-up, burst-pipe tear-out: mark it urgent and the on-call crew goes out. A flat emergency fee of $500–$1,500 is quoted before anyone rolls.

Get emergency help

The front desk

How the front desk answers a storm call.

Hail hit last night and the garage is leaking. The desk stops the water first, then books the inspection.

  • Answers early mornings and evenings, in English or Spanish
  • Dispatches the on-call crew for emergencies
  • Books the free inspection or in-home estimate

Example call, not a real customer

Carpenter front deskIncoming call · Sun 6:10 AM

CallerHail hit my roof last night. Can someone look at it?

Front deskSorry to hear it. We do a free documented inspection within 24–48 hours. Is anything leaking right now?

CallerA little, in the garage.

Front deskThen let's stop the water first. Our on-call crew can tarp tonight, and the emergency fee is quoted before anyone rolls.

CallerYes, please send them.

Tarp crew requested · inspection bookedAndrew gets a text

Reviews

Every review gets a real reply.

Andrew answers each review in his own voice. Samples below, written for this example site and clearly marked.

Andrew walked the job himself and told me straight the addition would take six weeks for permits. It did. You can't imagine how rare "they said what they meant" is.

Diana
McKinney

Reply from Andrew

Thank you, Diana. Telling you the permit timeline on day one, not week five, is how every job should go. Enjoy the new space.

— Andrew Carpenter, Carpenter Construction

Our hail claim was a mess until they met the adjuster on the roof. They found decking damage you can't see from the driveway, and they told us up front we'd pay our own deductible.

Rob
Arlington

Reply from Andrew

Thanks, Rob. The adjuster sees the roof once; we'd rather he see all of it. And yes: the deductible is always the owner's. That part isn't negotiable.

— Andrew Carpenter, Carpenter Construction

The contingency line is what sold me. They found old wiring behind the range, sent photos, wrote the change order, and the line covered it. Nothing moved until I said yes.

Priya
Plano

Reply from Andrew

That's what the line is for, Priya. When we find something behind a wall, you see it before you pay for it. Enjoy the kitchen.

— Andrew Carpenter, Carpenter Construction

Sample reviews  Written for this example site. They are not from real customers.

Service area

The DFW metroplex.

Our shop is in Fort Worth. We quote anywhere in Collin, Denton, Dallas and Tarrant counties at no trip charge.

  • Fort Worth
  • Dallas
  • Arlington
  • Plano
  • Frisco
  • McKinney
  • Allen
  • Prosper
  • Irving
  • Grand Prairie
  • Garland
  • Richardson
  • Carrollton
  • Denton
  • Southlake
  • Keller
  • Mansfield
  • Grapevine

Hablamos español: write to us and we answer in your language. Not on the list? Ask anyway.

ProsperMcKinneyDentonFriscoAllenPlanoSouthlakeKellerGrapevineRichardsonCarrolltonGarlandIrvingDallasGrand PrairieArlingtonMansfield Fort Worth OUR SHOP N
Schematic, not to scale. Inside the dotted line there's no trip charge.

FAQ

The questions people actually ask

The real objections, answered in writing before the sales visit.

Why is your bid higher than the other guy's?
Usually because ours includes what his leaves out: permits, floor protection, haul-off, licensed plumbing and electrical, and a visible contingency line. Put the two bids side by side and check whether his names the cabinet line, the tile and the fixtures. We'll walk through both with you, free.
How much do you need up front?
No more than 25% down, and on small jobs often nothing until materials are ordered. Every payment after that follows a finished, inspected milestone, and the final payment comes after you sign off on the walkthrough.
Do you offer financing? Is it a rip-off?
We offer it, and we'll tell you when not to use it. A 0% promo costs us a dealer fee, so ask for both the cash price and the financed price. If you have a cheaper home equity line, that may be the better money.
How long will my kitchen take, and can I live at home?
A refresh runs 2–4 weeks, a mid-range remodel 6–10 weeks, a full gut 12–20 weeks. Cabinets arrive before demo starts. Yes, you can live at home: we set up a temporary kitchen station, seal the work zone and clean up daily.
What happens when you find something bad behind the wall?
Work in that area pauses, you get photos and a written change order with a price, and nothing moves until you approve it. That is what the contingency line is for, and if it isn't used, you keep it.
Texas doesn't license contractors. How do I know you're legit?
Ask for what is verifiable: the certificate of insurance before work starts, and the state license numbers of every electrician and plumber on your job. A contractor who hesitates on any of those is telling you something.
Who is actually in my house?
Our demo, carpentry and tile crews are our own employees, led by a named project manager. Plumbing, electrical and HVAC go to the same licensed partner companies every time, and their license numbers appear on your invoice.
Will you handle my hail claim so I don't pay anything?
No, and please run from anyone who says yes. Waiving or absorbing a deductible is illegal in Texas. What we do: a free documented inspection, meeting your adjuster on the roof, handling supplements, and building at the approved price.

Free estimate

Got a project? Tell us about it.

Describe the job and pick a start window. We visit within 48 hours, 45 to 60 minutes, and you get a written ballpark range on the spot.

Typical range for this job$12K–$125K+Refresh, mid-range or full gut. The visit turns it into a written range.
  • Free in-home estimate within 48 hours, 45–60 minutes
  • No more than 25% down; payments tied to completed milestones
  • Free documented hail inspection, 24–48 hours
  • Quotes anywhere in Collin, Denton, Dallas and Tarrant counties at no trip charge
  • Hablamos español: we answer in your language
Add your city.
Add your name.
Add a number we can text.
Sending…
Demo form: nothing was sent. On a live install, this request goes straight to Carpenter Construction.
That didn't go through. Check your connection and try again.

Sample site · made by Centera

Want a site like this for your business?

Ten minutes on video, and we show you what yours would look like.

Book your 15-minute business review